| COMPLETIONS AND ONGOING WORKS IN THE LAST 10 YEARS | |||||
| EMPLOYER | PROJECT NAME (EN) | PROJE ADI (TR) | DATE OF CONTRACT | TYPE (OFFICE / HOSPITAL/HOUSING VB.) | |
| 1 | 39th Air Base Wing (39 ABW) | INSTALLATION OF FIBER OPTIC CABLING SYSTEM FOR BUILDINGS #952 & 954 | BİNALAR İÇİN FİBER OPTİK KABLOLAMA SİSTEMİ KURULUMU | 11.21.2003 | FIBER OPTIK KABLOLAMA |
| 2 | 39th Air Base Wing (39 ABW) | MAINTAIN COMMUNICTATION SUPPORT CABLE, FIBER OPTIC DIST SYS | İLETİŞİM DESTEK KABLOSU , FİBER OPTİK SİSTEM BAKIMI | 8.11.2004 | FIBER OPTIK SISTEM BAKIMI |
| 3 | 39th Air Base Wing (39 ABW) | INSTALL FIBER OPTIC DIST. SYS . IN SUPPORT OF ADSL AT INCIRLIK AB. | ADSL SİSTEMİ DESTEGİ İÇİN FİBER OPTİK DAGITIM SİSTEMİ TESİSİ | 7.08.2005 | FIBER OPTIK SISTEMI |
| 4 | 39th Air Base Wing (39 ABW) | REPAIR SECURITY FENCE GOLF, OTEL & INDIA LOOPS | GÜVENLİK ÇİTİ YENİLEMESİ | 9.19.2007 | ÇİT YENILENMESI |
| 5 | 39th Air Base Wing (39 ABW) | CNS COMM. DUCT BANKS AND INSTALL CABLE MUNITIONS AREA | HABERLEŞME KABLO KANALLARI INSASI VE KABLO DOSENMESI | 9.26.2007 | HABERLEŞME KABLOLAMA |
| 6 | 39th Air Base Wing (39 ABW) | CONSTRUCT COMMUNICATION CABLE SUPPORT , BULDG #89 | 89 NO ‘LU BINAYA HABERLEŞME KABLO DESTEGİ | 9.19.2007 | HABERLEŞME KABLOLAMA |
| 7 | 39th Air Base Wing (39 ABW) | CONNECT COMM. ANTENNA SUPPORT BLDG #682 | 682 NOLU BİNADA HABERLEŞME ANTENİ DESTEK İNŞAATI | 9.25.2007 | HABERLESME KABLOLAMA |
| 8 | 39th Air Base Wing (39 ABW) | CONSTRUCT COMM. CABLE SUPPORT DORMS | YATAKHANELERDE HABERLEŞME HATLARININ İYİLEŞTİRİLMESİ | 9.24.2007 | HABERLESME KABLOLAMA |
| 9 | 39th Air Base Wing (39 ABW) | REPAIR RENOVATE DINING AREA GOLF CLUB A&E | GOLF BİNASININ YEMEK ALANI TAMİRİ DİZAYN | 10.06.2011 | DIZAYN |
| 10 | 39th Air Base Wing (39 ABW) | MAINTAIN COMMUNICATION SUPPORT CABLE , PHASE 1,2 AND 3 | İLETİŞİM DESTEK HATLARININ BAKIMI ,ONARIMI, EVRE 1 , 2 VE 3 | 8.11.2008 | HABERLESME KABLOLAMA |
| 11 | 39th Air Base Wing (39 ABW) | SANITARY SEWER SYSTEM SURVEY, MFH | PİS SU HATLARININ ARAŞTIRILMASI | 9.02.2010 | DIZAYN |
| 12 | 39th Air Base Wing (39 ABW) | STRUCTURAL SURVEY BLDG 952 | BİNA YAPISI TEFTİŞİ BİNA NO: 952 | 2.02.2011 | DIZAYN |
| 13 | 39th Air Base Wing (39 ABW) | REPAIR REVONATE DINING AREA AT GOLF CLUB | GOLF KLÜP YEMEK ALANININ ONARIMI | 9.06.2011 | RENOVASYON |
| 14 | 39th Air Base Wing (39 ABW) | LIGHNING PROTECTION SYSTEM BLDG 309 | YILDIRIMDAN KORUNMA SİSTEMİ BİNA 309 | 5.29.2009 | YILDIRIMDAN KORUNMA SISTEMI |
| 15 | 39th Air Base Wing (39 ABW) | PHANTOM (MFH) LJYC 06‐4003 | İLETİŞİM KABLOLARININ EKLEME YAPILMASI | 1.30.2009 | HABERLESME KABLOLAMA |
| 16 | 39th Air Base Wing (39 ABW) | CABLE INSTALLATION | KABLO MONTAJI | 10.08.2009 | KABLOLAMA |
| 17 | 39th Air Base Wing (39 ABW) | COMM CABLE RELOCATION/SPLICING (VSF) | HABERLEŞME KABLOSUNUN YER DEĞİŞTİRİLMESİ | 11.19.2009 | HABERLESME KABLOLAMA |
| 18 | 39th Air Base Wing (39 ABW) | REPLAC ( C ) RAMP GATE | C RAMPASI KAPISININ YENİLENMESİ | 1.07.2010 | INSAAT KAPI YENILEME |
| 19 | 39th Air Base Wing (39 ABW) | DRILL WATER TEST WELLS | SU TESTİ KUYUSUNUN AÇILMASI | 1.05.2010 | YERALTI SU KUYUSU ACILMASI |
| 20 | 39th Air Base Wing (39 ABW) | REPAIR LPS MAIN ELECTRICAL SUBSATION | ANA ELEKTRİK TRAFOSU LPS ONARIMI | 7.29.2010 | YILDIRIMDAN KORUNMA SISTEMI |
| 21 | 39th Air Base Wing (39 ABW) | JOINT SEAL ARFIELD PAVEMENT | UÇUŞ BÖLGESİ DERZ DOLGUSUNUN YAPIMI | 2.03.2010 | DERZ DOLGU INSAATI |
| 22 | 39th Air Base Wing (39 ABW) | A&E DESING LJYC‐1017 | HAVA TAŞIMACILIĞI TERMİNAL BİNASI KLİMA SİST.ONR.İŞ.PROJELENDİRİLM | 2.01.2010 | KLIMA SISTEMI TAMIRATI |
| 23 | 39th Air Base Wing (39 ABW) | A&E DESING LJYC‐1020 | JIMNASTİK MERKEZİ HVAC SİSTEMİ ONARIM İŞ.PROJELENDİRİLMESİ | 2.01.2010 | HVAC SISTEM TADILATI |
| 24 | 39th Air Base Wing (39 ABW) | A&E DESING LJYC‐1044 | SU KAYNAKLARI ATFP GİRİŞLERİNİN PROJESİ YAPILMASI | 2.01.2010 | DIZAYN |
| 25 | 39th Air Base Wing (39 ABW) | TAXIWAY EDGE LIGHTS INDIA LOOP | YANAŞMA IŞIKLARININ TAMİRİ VE YENİLENMESİ | 3.13.2012 | PİST IŞIKLANDIRMA |
| 26 | 39th Air Base Wing (39 ABW) | REPLAC ( B ) RAMP GATE | B RAMPASI KAPISININ YENİLENMESİ | 6.24.2010 | INSAAT KAPI YENILEME |
| 27 | 39th Air Base Wing (39 ABW) | REPAIR LIGHTING PROTECTION SYSTEM BLDG 370 | YILDIRIMDAN KORUNMA SİSTEMİNİN ONARIMI‐BİNA 370 | 10.01.2012 | YILDIRIMDAN KORUNMA SISTEMI |
| 28 | 39th Air Base Wing (39 ABW) | REPLACE NPT EDGELIGHTS CABLING, FAC #5070 | NPT KENAR LAMBALARININ KABLO DEĞİŞİMİ, BİNA 5070 | 11.11.2014 | KUZEY TAXIWAY IŞIKLANDIRMA |
| 29 | 39th Air Base Wing (39 ABW) | MAINTENANCE OF OIL/WATER SEPERATORS AND | YAG TUTUCULARININ VE GRES AGIZLARININ BAKIMI | 10.01.2009 | BAKIM VE ONARIM |
| 30 | 39th Air Base Wing (39 ABW) | REPLACE FEEDER CABLE | BESLEME KABLOSUNUN DEĞİŞİMİ | 6.19.2015 | KABLOLAMA VE INSAAT |
| 31 | 39th Air Base Wing (39 ABW) | UPGRADE MOTOR CONTROL CENTER | KANALİZASYON SİSTEMİNİN MOTOR KONTROL MERKEZİNİN İYİLEŞTİRİLMESİ | 11.26.2015 | KABLOLAMA VE INSAAT |
| 32 | 39th Air Base Wing (39 ABW) | FITNESS EQUIPMENT MAINTANCE | FİTNISS SPOR SALONU ( 5 YILLIK ) 3.YIL | 10.01.2013 | BAKIM ONARIM |
| 33 | 39th Air Base Wing (39 ABW) | CONSTRUCT PARKING LOT NEAR BLDG. 7298&7299 | 7298 VE 7299 NOLU BİNALAR İÇİN PARK SAHASI İNŞAASI | 22.12.2015 | PARK SAHASI INSAATI |
| 34 | 39th Air Base Wing (39 ABW) | 590 BLDG,CONSTRUCTION | 590 NOLU BİNADA YAPIM İŞLERİ | 12.22.2015 | RENOVASYON |
| 35 | 39th Air Base Wing (39 ABW) | RPR HVAC SYSTEM, CE/OPS ADMIN FACILITY | CE İDARİ BİNASI HVAC SİSTEMİ ONARIMI İŞİNİN PROJELENDİRİLMESİ | 2.01.2010 | HVAC SISTEM TADILATI |
| 36 | 39th Air Base Wing (39 ABW) | RPR HVAC SYSTEM, BASE OPS/TOWER COMPLEX | ÜS OPERASYON KULESİ HYAC ONARIMI İŞİNİN PROJELENDİRİLMESİ | 2.01.2010 | HVAC SISTEM TADILATI |
| 37 | 39th Air Base Wing (39 ABW) | RPR HVAC SYSTEM, FAMILY SUPPPORT CENTER | AİLE DESTEK MERKEZİ HVAC SİSTEMİ ONARIMI İŞİNİN PROJELENDİRİLMESİ | 2.01.2010 | HVAC SISTEM TADILATI |
| 38 | 39th Air Base Wing (39 ABW) | RPR/RPL VEHICLE GATES (LJYC 08‐1059) | ARAÇ KAPILARININ ONARIMI / YENİLENMESİ | 7.01.2010 | TADILAT |
| 39 | 39th Air Base Wing (39 ABW) | REPAIR DRMO GATE BLG 200 | DDRMO KAPISI ONARIMI BİNA 200 | 7.29.2010 | RENOVASYON |
| 40 | 39th Air Base Wing (39 ABW) | REPAIR ROOF BLDG# 370 | 370 NOLU BİNA ÇATI ONARIMI | 11.26.2010 | CATI TADILATI YENILENMESI |
| 41 | 39th Air Base Wing (39 ABW) | RPR WATER SUPPLY SYSTEM PH 1 | SU BESLEME SİSTEMİNİN ONARIMI FAZ 1 | 10.01.2010 | SU HATTI YENILENMESI |
| 42 | 39th Air Base Wing (39 ABW) | RPR FIRE ALARM SYSTEM | YANGIN ALARM SİSTEMİNİN ONARIMI | 6.14.2011 | YANGIN ALARM SISTEMI ONARIMI |
| 43 | 39th Air Base Wing (39 ABW) | PAINT BAK‐12 SHSDS AND NAVAIDS EQUIPMENTS | BAK‐12 KULUBELERİNİN VE NAVAID EKİPMANLARININ BOYANMASI | 7.28.2011 | BOYAMA |
| 44 | 39th Air Base Wing (39 ABW) | JOINT SEAL AIRFIELD PAVEMENT | UCUŞ ALANINDA DERZ DOLGU UYGULAMASI | 12.07.2010 | DERZ DOLGU UYGULAMASI |
| 45 | 39th Air Base Wing (39 ABW) | RENOVATE BALL ROOM BAR AREA BLDG 878 | BALO SALONU BAR ALANI TAMİRİ BİNA NO:878 | 1.12.2011 | TADILAT |
| 46 | 39th Air Base Wing (39 ABW) | REPAIR AND AND PAINT WATER FEED TANK | SU İKMAL TANKININ KURULUMU | 5.05.2011 | TANK KURULUMU |
| 47 | 39th Air Base Wing (39 ABW) | REPLACE WATER MONITORING CABLES | SU SİSTEMİ KONTROL KABLOLARI DEĞİŞİMİ | 1.02.2013 | KABLOLAMA VE INSAAT |
| 48 | 39th Air Base Wing (39 ABW) | ENGINEERING SUPPORT CABLE INSTALLATION | HABERLEŞME KABLOLARININ YENİLENMESİ | 12.28.2010 | KABLOLAMA VE INSAAT |
| 49 | 39th Air Base Wing (39 ABW) | DASR SITE PREPARATION | DASR ALAN HAZIRLIĞI | 1.06.2012 | TAMIRAT |
| 50 | 39th Air Base Wing (39 ABW) | INSTALL GFM RADIATION DETECTION SYSTEM | RADYASYON DEDEKTÖRÜ YERLEŞTİRİLMESİ | 6.14.2011 | IRADYSYON DETEKTORU YERLESTIRILMESI |
| 51 | 39th Air Base Wing (39 ABW) | RPR/REPL GREASE TRAPS, BOWLING CENTER | YAĞ AYRIŞTIRICININ ONARIMI | 8.10.2011 | BAKIM ONARIM |
| 52 | 39th Air Base Wing (39 ABW) | ENGINEERING SUPPORT CABLE INSTALLATION LLOP AREA | MÜH.DESTEK KABLOSU YERLEŞTİRİLMESİ‐RİNG ALANI | 12.15.2010 | FIBEROPTIK VE BAKIR HABERLEŞME KABLOLAMA YAPILMASI |
| 53 | 39th Air Base Wing (39 ABW) | CNS PERMANENT G‐LOOP LATRINE | G‐LOOP’TA KALICI TUVALET İNŞAASI | 3.07.2014 | INSAAT |
| 54 | 39th Air Base Wing (39 ABW) | REPAIR ROOF AND SIDING AMC, BUILDING 500 | 500 nolu AMC BİNASI ÇATI VE CEPHE TAMİRATI | 8.22.2011 | CATI YENILENMESI |
| 55 | 39th Air Base Wing (39 ABW) | REPLACE ELECTRICAL MAIN PANELS | ÇEŞİTLİ BİNALARDA ANA ELEKT.PANOSUNUN DEĞİŞ. | 1.02.2013 | ELEKTRIK YENILENME |
| 56 | 39th Air Base Wing (39 ABW) | MAINTAIN ELEVATED WATER TANK,A STREET | A CADDESİNDEKİ YÜKSELTİLMİŞ SU TANK.BAK. | 3.13.2012 | SU TANKI YENILENMESI |
| 57 | 39th Air Base Wing (39 ABW) | DODDS TEMPORARY SOLUTION OF HVAC SYSTEM | İLKOKUL HVAC SİSTEMİNİN GEÇİCİ ÇÖZ. | 8.22.2011 | HVAC SISTEM TADILATI |
| 58 | 39th Air Base Wing (39 ABW) | SUPPORT TEMPORARY INTRUSION DETECTION SYSTEM,WS3 | GEÇİCİ SALDIRI ALGILAMA SİST.DEST. | 5.31.2012 | KABLOLAMA VE INSAAT |
| 59 | 39th Air Base Wing (39 ABW) | CNS WATER PRE‐TREATMENT CENTER,AMC TERMINAL | SU ÖN ARITMA SİSTEMİ,AMC TERMİNALİ | 9.14.2011 | TADILAT |
| 60 | 39th Air Base Wing (39 ABW) | PROVIDE AND INSTALL EMERGENCY PHONES | ARKADAŞ PARKA ACİL TELEFON HATTI ÇEKİLMESİ VE SAĞ. | 8.10.2011 | HABERLESME KABLOLAMA |
| 61 | 39th Air Base Wing (39 ABW) | CHEMICAL LATRINES, SHOWERS, HANDWASH STATION SERVICES | TUVALET, DUŞ, EL YIKAMA İSTASYONU HİZMETİ (3 AY) | 1.17.2012 | HIZMET |
| 62 | 39th Air Base Wing (39 ABW) | PROVIDE NETWORK ACCESS BETWEEN ASF&ODC (ANKARA) | ASF VE ODC ARASI NETWORK BAĞLANTISI YAPILAMASI | 9.21.2011 | KABLOLAMA |
| 63 | 39th Air Base Wing (39 ABW) | UPGRADE DASR P3 (STARS) | DASR P3 GÜÇLENDİRİLMESİ | 4.04.2012 | KABLOLAMA |
| 64 | 39th Air Base Wing (39 ABW) | RPR HVAC PIPING INSULATION BLDG 900 | 900 NOLU BİNANIN İZOLASYON YENİLENMESİ | 1.02.2013 | TADILAT TAMIRAT |
| 65 | 39th Air Base Wing (39 ABW) | RETROFIT HIGHBAY METAL HALIDE LIGHT WITH INDUCTION LIGHTS | HIGH BAY METAL HALIDE ARMATÜRLERİN İNDÜKSİYON ARMATÜRLER İLE YEN. | 10.01.2013 | LAMBA DEGISIMI |
| 66 | 39th Air Base Wing (39 ABW) | RENOVATE PPORTION OF 877 FOR PEN FED AAFES | 877 NO’LU BİNANIN PEN FED VE AAFES İÇİN KISMİ RENOVASYONU | 11.18.2014 | RENOVASYON |
| 67 | 39th Air Base Wing (39 ABW) | UPGRADE LIGHTING C RAMP GATE | C RAMPASI KAPISININ AYDINLATMASININ İYİLEŞTİRİLMESİ | 11.08.2013 | AYDINLATMA DEGISIMI VE INSAAT |
| 68 | 39th Air Base Wing (39 ABW) | UPGRADE CLINIC SPECIALTY CLINIC | ÖZEL KLİNİĞİN İYİLEŞTİRİLMESİ | 1.10.2014 | TADILAT TAMIRAT |
| 69 | 39th Air Base Wing (39 ABW) | RPR STROM DEAINAGE,CDC BLDG 947 | BİNA 947 YAĞMUR DRENAJ ONARIMI | 8.01.2013 | TADILAT TAMIRAT |
| 70 | 39th Air Base Wing (39 ABW) | RPR REP SOUTH PARALLEL TAXIWAY EDGE LIGHTS FAC*5070 | GUNEY PARALEL TAXIYOLU KENAR LAMBALARININ ONARIM VE DEĞİŞİMİ | 1.09.2014 | LAMBA DEGISIMI |
| 71 | 39th Air Base Wing (39 ABW) | REPAIR ATFP REQUIREMENTS BLDG 912 | BİNA 912 ATFP İHTİYAÇLARININ ONARIMI | 12.27.2013 | TADILAT TAMIRAT |
| 72 | 39th Air Base Wing (39 ABW) | INSTALL FIRE HYDRANT FOR FAC#2020 | 2020 BINASI İÇİN YANGIN HİDRANTI MONTAJI | 4.02.2014 | HIDRANT MONTAJI |
| 73 | 39th Air Base Wing (39 ABW) | CORRECT FSD 1 DEFICIENCIES VARIOUS FACILITIES | MUHTELİF BİNALARDA YANGIN GÜVENLİK EKSİKLERİNİN GİDERİLMESİ | 1.16.2014 | YANGIN ALARM SISTEMI ONARIMI |
| 74 | 39th Air Base Wing (39 ABW) | RPR. FIRE TRAINING TOWER STAIRS | YANGIN EĞİTİM KULESİNİN MERDİVENLERİNİN ONARIMI | 1.08.2013 | TADILAT TAMIRAT |
| 75 | 39th Air Base Wing (39 ABW) | REPAIR RUNWAY SHOULDERS | PIST BANKETLERININ ONARIMI FAZ‐5 | 2.03.2015 | BANKET YENILENMESI |
| 76 | ITSI GILBANE | YAKIT HATLARININ İYİLEŞTİRİLMESİ | 12.13.2013 | TADILAT TAMIRAT | |
| 77 | 39th Air Base Wing (39 ABW) | REPAIR ADJUST EXHAUST FAN CONTROL DORM FACILITIES | YATAKHANE BINALARI EGZOS FAN KONTROL TAMIRI VE AYARLANMASI | 12.10.2013 | EGSOZ FAN SISTEMI YAPILMASI |
| 78 | 39th Air Base Wing (39 ABW) | REPAIR FACILITY FLOOR, BLDG. 200 | 200 NOLU TESİSİN ZEMİN ONARIMI | 4.29.2014 | ZEMIN ONARIMI |
| 79 | 39th Air Base Wing (39 ABW) | RPR ROOF PATRIOT VILLAGE 7301‐7316 | PATRIOT KÖYÜ ÇATI ONARIMI 7301‐7316 | 8.29.2014 | CATI YENILENMESI |
| 80 | 39th Air Base Wing (39 ABW) | UPGRADE COPPER CABLE DISTRUBITION | BAKIR KABLO DAĞITIMININ İYİLEŞTİRİLMESİ | 9.23.2014 | KABLOLAMA VE INSAAT |
| 81 | 39th Air Base Wing (39 ABW) | CNS UPGRADE PATRIOT VILLAGE ROAD | PATRIOT KÖYÜ YOL İNŞAATI VE İYİLEŞTİRİLMESİ | 5.09.2014 | ASFALT YOL YENILENMESI |
| 82 | 39th Air Base Wing (39 ABW) | INSTALL PIGEON NETTING BLDG 200 | 200 NOLU BİNANIN GÜVERCİN AĞI MONTAJI | 4.14.2014 | CATIYA GUVERNCIN AGI MONTAJI |
| 83 | 39th Air Base Wing (39 ABW) | REPAIR RUNWAY SHOULDER PH VI | PİST BANKETLERİNİN ONARIMI FAZ‐6 | 12.27.2013 | BANKET YENILENMESI |
| 84 | 39th Air Base Wing (39 ABW) | REPAIR CLOSET AND PATIO DOOR, EAGLE HOUSING | EAGLE EVLERİ GARDROP VE TERAS KAPILARI ONARIMI | 2.08.2015 | TADILAT TAMIRAT |
| 85 | 39th Air Base Wing (39 ABW) | REPAIR HVAC SYSTEM, BUILDING #482 AND 485 | 482 VE 485 NOLU BİNALARDA HVAC SİSTEMİ ONARIMI | 10.01.2013 | HVAC SISTEM YENILENMESI |
| 86 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE VALVES, WATERLINES EAGLE HOUSING | ŞAHİN EVLERİ VANA VE SU HATLARI TAMİRİ/DEĞİŞİMİ | 10.01.2013 | SU HATTI YENILENMESI |
| 87 | 39th Air Base Wing (39 ABW) | RPR REPLACE ROLL UP DOORS AMC B500 | AMC BINA 500 SARMAL KAPI TAMİRİ/DEĞİŞİMİ | 3.20.2015 | SARMAL KAPIALRIN YENILENMESI |
| 88 | 39th Air Base Wing (39 ABW) | RPR/RPL RUNWAY EDGLELIGHTING | PIST KENAR LAMBALARININ ONARIMI VE DEĞİŞİMİ | 2.04.2015 | LAMBA DEGISIMI |
| 89 | 39th Air Base Wing (39 ABW) | INSTALL ENERGY MONITOR MFH | EVLERDE ENERJİ İZLEME CİHAZLARININ MONTAJI | 2.16.2015 | ENERJI IZLEME CIHAZI MONTAJI |
| 90 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE PRIVACY FENCING MFH EAGLE HOUSING PH‐2 | EAGLE EVLERİ ÇİT ONARIMI VE DEĞİŞİ FAZ 2 | 1.16.2015 | CIT YENILENMESI |
| 91 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE PRIVACY FENCING MFH EAGLE HOUSING PH‐3 | EAGLE EVLERİ ÇİT ONARIMI VE DEĞİŞİ FAZ 3 | 2.22.2016 | CIT YENILENMESI |
| 92 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE SEWER MANHOLES | KANALİZASYON MENHOLERİNİN DEĞİŞİM VE ONARIMI | 5.20.2015 | KANALIZASYON ROGARLARININ YENILENMESI |
| 93 | 39th Air Base Wing (39 ABW) | REPAIR HVAC MX FACILITIES 116‐117‐119 | 116‐117‐119 NOLU BİNALARDA KLİMA ONARIMI | 7.31.2015 | KLIMA SISTEMI YENILENEMSI |
| 94 | 39th Air Base Wing (39 ABW) | REPAIR TIMERS FOR BATHROOMS | BANYOLARDA FAN ZAMANLAYICILARININ ONARIMI | 5.05.2015 | FAN ZAMANLAYICI YENILENEMSI |
| 95 | 39th Air Base Wing (39 ABW) | REPAIR DOCUMENT STAGING ROOM | DOKUMAN SAKLAMA ODASININ TAMİRİ | 3.11.2016 | TAMIRAT TADILAT |
| 96 | 39th Air Base Wing (39 ABW) | MAINTAIN ELEVATED WATER TANK (D ST FAC5074) | YUKSELTILMIS SU TANKININ ONARIMI | 10.07.2015 | SU TANKI YENILENMESI |
| 97 | 39th Air Base Wing (39 ABW) | REPAIR STORM DRAINAGE BASIN 5 | YAGMUR SUYU DRENAJ HATTININ IYILESTIRILMESI | 5.20.2015 | DRENAJ HATTI YENILENMESI |
| 98 | 39th Air Base Wing (39 ABW) | REPLACE ELECTRICAL PANELS IN AIRCRAFT HANGARS | UCAK HANGARLARINDA ELECKTIRK PANOLARININ DEGISIMI | 11.27.2015 | ELEKTRIK PANO DEGISIMI |
| 99 | 39th Air Base Wing (39 ABW) | REPLACE EXTERIOR LIGHTING WITH ENERGY EFFICIENT ONES BW | SOKAK AYDINLATMALARININ ENERJI TASARRUFLU AYDINLATMALAR ILE DEGISIMI | 5.20.2015 | ARMATUR DEGISIMI |
| 100 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE RUBBER FLOORING B 971 | KAUCUK ZEMINLERIN ONARIM VE DEGISIMI BINA 971 | 6.18.2015 | ZEMIN YENILENEMSI |
| 101 | 39th Air Base Wing (39 ABW) | REPAIR BILLETING SIDEWALKS | KONAKLAMA BINALARI YURUME YOLU TAMIRI | 12.24.2015 | YURUME YOLU YENILENMESI |
| 102 | 39th Air Base Wing (39 ABW) | REPAINT FADED AIRFIELD MARKINGS | UCUS SAHASI ISARETLERININ YENIDEN BOYANMASI | 1.30.2017 | YOL BOYASI UYGULANMASI |
| 103 | 39th Air Base Wing (39 ABW) | INSTALL 10KV POWER CABLE TR90 TO TR125 | TR 90 DAN TR125 10KV KABLO MONTAJI | KABLOLAMA VE INSAAT | |
| 104 | 39th Air Base Wing (39 ABW) | RPR INSTALL REF. REPAINT ST LINES A AVE | A CAD. YENIDEN BOYANMASI VE REFLEKTOR MONTAJI | 10.22.2015 | YOL BOYASI UYGULANMASI |
| 105 | 39th Air Base Wing (39 ABW) | RPR INTERIOR LIGHTING BLDG. 878 | BINA 878 IC AYDINLATMASININ ONARIMI | 3.11.2016 | ARMATUR DEGISIMI |
| 106 | 39th Air Base Wing (39 ABW) | REPAIR REPLACE GENERATORS 33, 5033, 551 | JENERATOR 33, 5033 VE 551 IN ONARIM VE DEGISIMI | 3.17.2016 | JENERATOR DEGISIMI VE INSAAT |
| 107 | 39th Air Base Wing (39 ABW) | RENOVATE CLUB BALL ROOM | KULUP BALO SALONUNUN YENILENMESI | 2.11.2016 | RENOVASYON |
| 108 | 39th Air Base Wing (39 ABW) | REPAIR STORM DAMAGE VARIOUS FACILITIES | MUHTELİF BİNALARDA FIRTINA HASARI ONARIMI | 1.21.2016 | TAMIRAT ,TADILAT,KAPI DEGISIMI,KABLOLAMA , CIT YENILENMES |
| 109 | 39th Air Base Wing (39 ABW) | REPLACE CARPET VARIOUS BUILDINGS | MUHTELİF BİNALARDA HALI ONARIMI | 12.07.2015 | HALI YENILENMESI |
| 110 | 39th Air Base Wing (39 ABW) | REPAIR SANITARY SEWER SYSTEM B364 | 364 NOLU BINADA PIS SU TESISATI ONARIMI | 1.25.2016 | PIS SU TESISAT YENILENMESI |
| 111 | 39th Air Base Wing (39 ABW) | REPAIR/PEPLACE SECURITY FENCE,AMD YARD ,BLDG 500 | BİNA 500 GÜVENLİK ÇİT TAMİRATI | 4.07.2017 | CIT YENILENMESI |
| 112 | 39th Air Base Wing (39 ABW) | WATER LINES EAGLE HOUSING | KARTAL EVLERİ SU HATTI | 1.31.2017 | SU HATTI YENILENMESI |
| 113 | 39th Air Base Wing (39 ABW) | REPAIR ROOF AFN BUILDING 900 | BİNA 900 ÇATI TAMİRATI | 4.28.2017 | CATI YENILENMESI |
| 114 | 39th Air Base Wing (39 ABW) | REPAIR ELECTRICAL PANEL BLDG 282 | BİNA 282 ELEKTRIK PANO TAMIRATI | 4.03.2017 | ELEKTRIK PANO DEGISIMI |
| 115 | 39th Air Base Wing (39 ABW) | REPAIR ROOF REFUELLER MAINT.BLDG 116 | BİNA 116 ÇATI ONARIMI | 4.29.2017 | CATI YENILENMESI |
| 116 | 39th Air Base Wing (39 ABW) | WATER SYSTEM/CROSS‐CONNECTION SURVEY,BASE WIDE | SU HATLARININ ÜST GENELİNDE TESPİTİ | 9.19.2016 | SU HATTI YENILENMESI |
| 117 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE ROLL‐UP DOORS BLDG 435 | BİNA 435 ROLL UP DOOR TAMIRATI | 9.22.2016 | SARMA KAPI YENILENMESI |
| 118 | 39th Air Base Wing (39 ABW) | REPAIR ROOF,COMM GENERATOR BLDG 472 | BİNA 472 ÇATI TAMİRATI | 7.11.2017 | CATI YENILENMESI |
| 119 | 39th Air Base Wing (39 ABW) | REPAIR/PAINT EQUIPMENT ROOM FLOOR BASE SUPPLY WAREHOUSE,BLDG 252 | EPOKSİ ZEMİN KAPLAMA YAPIMI BİNA 252 | 9.23.2016 | EPOKSI ZEMIN KAPLAMA YENILENEMSI |
| 120 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE BASE PERIMETER LIGHT WITH EFFICENT TYPE | ÜS ÇEVRE AYDINLATMASININ VERIMLI TIP ILE DEGİŞTIRILMESİ VE TAMIRI | 1.19.2017 | ARMATUR DEGISIMI |
| 121 | 39th Air Base Wing (39 ABW) | REPAIR LPS SYSTEM ELECTRIAL SUBSTATIONS | PARATONER SİSTEMLERİ TAMİRATI, ELEKTRİK TRAFO MERKEZLERİ FAZ | 5.07.2018 | PARATONER SISTEMI DEGISIMI |
| 122 | 39th Air Base Wing (39 ABW) | REPAIR D STREET PAVEMENT | D CADDESININ ONARIMI | 5.20.2015 | ASFALT YOL VE ALT YAPI YENILENMESI |
| 123 | 39th Air Base Wing (39 ABW) | RPR REMOVE ASBESTOS CONTAINING MATERIALS G&V LOOPS SHELTERS | G&V HANGARLARINDA ASBEST ICEREN MALZEMELERIN SOKULMESI | 11.17.2015 | GOLF VE VICTOR LOOP TA BULUNAN HANGARLARDA ASBEST MA |
| 124 | 39th Air Base Wing (39 ABW) | REPLACE CARPET DFAC BLDG. 965 | 965 No’lu Bina Halı Değişimi | 12.29.2017 | HALI YENILENMESI |
| 125 | 39th Air Base Wing (39 ABW) | FIBER OPTIC CABLE LINK | Fiber Optik Kablo Bağlantısı | 9.13.2017 | FIBER OPTIK KABLOLAMA |
| 126 | 39th Air Base Wing (39 ABW) | PaInt ExterIor B526 | Bina 526 Dış Cephe Boyanması | 7.09.2018 | DIS CEPHE BOYAMA |
| 127 | 39th Air Base Wing (39 ABW) | ARC Flash Survey | Ark Patlama Araştırması | 6.18.2018 | DIZAYN |
| 128 | 39th Air Base Wing (39 ABW) | UPGRADE APRON LIGHTING B&C RAMPS | B VE C RAMPALARI APRON ISIKLARININ IYILESTIRILMESI | 3.17.2016 | ARMATUR DEGISIMI VE INSAAT |
| 129 | 39th Air Base Wing (39 ABW) | XERISCAPE SERVICES | Çevre Düzenleme Hizmeti | 9.19.2017 | CEVRE DUZENLEME |
| 130 | 39th Air Base Wing (39 ABW) | REPAIR ROOF BUILDING 376 | 376 No’lu Bina Çatı Tamiratı | 6.18.2018 | CATI YENILENMESI |
| 131 | 39th Air Base Wing (39 ABW) | STRUCTURAL INTEGRITY SURVEY | Yapısal Bütünlük Tespiti | 4.25.2018 | DIZAYN |
| 132 | 39th Air Base Wing (39 ABW) | REPAIR STAIRWAYS TLFFAC. 1066 | 1066 No’lu Bina Merdiven Tamiratı | 2.06.2018 | MERDIVEN YENILENMESI |
| 133 | 39th Air Base Wing (39 ABW) | RPL RPR HVAC PIPING INSULATION B1066 | Bina 1066 Hvac Boru İzolasyon Tamiratı | 5.11.2018 | HVAC BORULAMA VE IZOLASYON YENILENMESI |
| 134 | 39th Air Base Wing (39 ABW) | REPLACE CARPET VARIOS FACILITIES | FARKLI BİNALARDA HALI DEGİŞİMİ PROJESİ | 10.17.2018 | HALI YENILENMESI |
| 135 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE MDP PANEL WATER PLANT, BUILDING 12‐13 | 12 VE 13 NOLU, SU ÜRETİM BİNALARININ MDP PANOLARININ TAMİRİ DEĞİŞİMİ | 10.19.2018 | PANO DEGISIMI |
| 136 | 39th Air Base Wing (39 ABW) | REPAIR GENERATOR BUILDING 2209 | 2209 Jeneratör Binası Tamiratı | 5.11.2018 | JENERATOR DEGISIMI VE INSAAT |
| 137 | 39th Air Base Wing (39 ABW) | RPR ROOF COVERS, BLDG 878 | Bina 878 Çatı Kaplama Tamiratı | 1.30.2019 | CATI YENILENMESI |
| 138 | 39th Air Base Wing (39 ABW) | REPLACE ROOF AND SIDE PANELS BLDG. #427 | Bina 427 Çatı Panelleri Değişimi | 6.18.2018 | CATI YENILENMESI |
| 139 | 39th Air Base Wing (39 ABW) | CONNECT PASS AND ID SEWER LINE TO BASE SEWER LINE | GİRİŞ KARTLARI BİNASI PİS SU HATTININ ÜS PİS SU HATTINA BAĞLANMASI | 8.03.2018 | PIS SU HATLARI YENILENMESI |
| 140 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE ROOF AND SIDE PANELS BLDG. #427 | 427 NOLU BİNANIN ÇATI VE DUVAR PANELLERİNİN TAMİR VE DEĞİŞİMİ | 6.18.2018 | CATI YENILENMESI |
| 141 | 39th Air Base Wing (39 ABW) | REPAIR AND REPLACE LIGHT FIXTURES BILETTING FACILITY, B 1082 | 1082 NOLU KONAKLAMA TESİSİNİN AYDINLATMA ARMATÜRLERİNİN TAMİRİ VE YENİLENMESİ | 1.16.2019 | ARMATUR DEGISIMI |
| 142 | 39th Air Base Wing (39 ABW) | REPAIR JOINT SEALS BUILDING 360 | 360 NOLU BİNANIN DERZ DOLGUSU ONARIMI | 12.06.2018 | DERZ DOLGU YENILENMESİ |
| 143 | 39th Air Base Wing (39 ABW) | BASE UTILITY MAP SURVEY | ÜS ALTYAPI TETKİKİ | 2.04.2019 | DIZAYN |
| 144 | 39th Air Base Wing (39 ABW) | REPAIR AND REPLACE SECURITY FENCE AROUND 2300 AREA | 2300 SAHASI GÜVENLİK FENSİNİN ONARIMI VE YENİLENMESİ | 2.02.2018 | CIT YENILENMESI |
| 145 | 39th Air Base Wing (39 ABW) | RPR REPLACE MV CABLE BETWEEN TR 8‐TR 73 | TR8 VE TR73 ARASINDA ORTA GERİLİM KABLOSU TAMİRİ | 11.29.2018 | ORTA GERILIM KABLO YENILENMESI VE INSAATI |
| 146 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE MV CABLE BETWEEN TR70‐TR 102 | TR70 VE TR102 ARASINDAKİ YÜKSEK GERİLİM KABLOLARININ TAMİRİ VE ONARIMI | 10.08.2018 | YUKSEK GERILIM KABLO YENILENMESI VE INSAATI |
| 147 | 39th Air Base Wing (39 ABW) | RPR ‘A’ AVENUE PAVEMENT AND WATER TRANSMISSION LINE | A’ CADDESİ KAPLAMA TAMİRATI VE SU İLETİM HATTI | 1.05.2017 | ASFALT KAPLAMA YENILENMESI VE ALT YAPI SU HATLARI YENILENMESI |
| 148 | 39th Air Base Wing (39 ABW) | REPAIR TENNIS AND BASKETBALL COURTS | TENİS VE BASKETBOL KORTLARININ TAMİRİ | 8.31.2018 | BASKETBOL SAHASI VE TENIS SAHASI YENILENMESI |
| 149 | 39th Air Base Wing (39 ABW) | RPR / RPLC CATHODIC PROTECTION UG FUEL TANKS MULTI FACILITIES | YERALTI YAKIT TANKLARININ KATOTIK KORUMASININ TAMİRİ VE DEĞİŞİMİ | 12.16.2019 | YAKIT TANKLARI KATOTIK KORUMA YAPILMASI VE YENILENMESI |
| 150 | 39th Air Base Wing (39 ABW) | REPLACE FENCE POWER PLANT, BUILDING #400 | ENERJİ SANTRALİNİN TEL ÇİTİNİN YENİLENMESİ, BİNA 400 | 11.14.2019 | CIT YENILENMESI |
| 151 | 39th Air Base Wing (39 ABW) | INSTALL ELECTRIC PANELSWITH OUTLETS DORM FACS | YATAKHANE BİNALARI ELEKTRİK PANOLARI VE PRİZ MONTAJI | 11.02.2018 | PANO DEGISIMI |
| 152 | 39th Air Base Wing (39 ABW) | INSTALL VENTILATION SYSTEM HOUSING WAREHOUSE | EVLERDEN SORUMLU BIRIMIN DEPOLARININ HAVALANDIRMA SISTEMI MONTAJI | 4.04.2019 | HAVALANDIRMA SISTEMI YENILENMESI |
| 153 | 39th Air Base Wing (39 ABW) | INS CATHODIC PROTECTION 6151 | 6151 NOLU YANGIN EGITIM TESISI KATODIK SISTEMI KURULUMU | 10.08.2019 | KATODIK SISTEM YENILENMESI |
| 154 | 39th Air Base Wing (39 ABW) | RPR RUNWAY STRIPING | PİST ÇİZGİLERİNİN YENİDEN BOYANMASI | 7.01.2020 | PIST CIZGILERI BOYANMASI |
| 155 | 39th Air Base Wing (39 ABW) | INSTALL BACK‐UP GENERATOR #488 | 488 NOLU BİNA İÇİN JENARATÖR MONTAJI | 11.27.2017 | JENATOR DEGISIMI VE INSAATI |
| 156 | 39th Air Base Wing (39 ABW) | REPAIR AND REPLACE FUEL TANK AT BASE POWER PLANT AND MULTI FACILITIES IAW | ÜS ENERJİ SANTRALİ VE DEĞİŞİK BİNALARIN YAKIT TANKI TAMİRİ/DEĞİŞİMİ | 9.07.2018 | YAKIT TANKLARI KATOTIK KORUMA YAPILMASI VE YENILENMESI |
| 157 | 39th Air Base Wing (39 ABW) | PROVIDE INFRASTRUCTURE TO INSTALL DKET ANTENNA, BUILDING 477 | 477 NOLU BINAYA DKET ANTEN MONTAJI ICIN ALTYAPININ SAGLANMASI | 7.01.2020 | YAKIT TANKI YENILENMESI |
| 158 | 39th Air Base Wing (39 ABW) | PROVIDE BACK‐UP POWER TO AMU, MARINE CORPS & FUTURE MAINTACE | AMU, DENİZ KUVVETLERİ & BAKIM EKİBİ İÇİN YEDEK GÜÇ TEMİNİ‐CEPHANELİK DESTEK GÜÇ | 11.02.2018 | YEDEK GUC SISTEMI YAPILMASI |
| 159 | 39th Air Base Wing (39 ABW) | INSTALL BACKUP GENERATOR BUILDING 281 | 281 NOLU BİNA JENERATÖR MONTAJI | 11.02.2018 | JENERATOR DEGISIMI VE INSAAT |
| 160 | 39th Air Base Wing (39 ABW) | RPR RPLC MEDIUM VOLTAGE CABLE BETWEEN B400&3610 | 400 VE 3610 NOLU BINALAR ARASINDAKI OG KABLOLARININ TAMIRI VE DEGISIMI | 10.01.2020 | ORTA GERILIM KABLO YENILENMESI VE INSAATI |
| 161 | 39th Air Base Wing (39 ABW) | REPAIR JOINT SEAL AIRFIELD PAVEMENTS | HAVAALANI KAPLAMA DERZLERININ TAMIRATI | 9.03.2018 | DERZ DOLGU YENILENMESI |
| 162 | 39th Air Base Wing (39 ABW) | REPAIR PATRIOT VILLAGE SHOWERS | PATRIOT VILLAGE DUŞLARIN TAMİRİ | 11.30.2017 | CADIRKENTTE DUSLARIN ALT YAPI VE TUM AKSESUARLARI ILE YENILENMESI |
| 163 | 39th Air Base Wing (39 ABW) | REPAIR MUNITIONS AREA ROADS, 2300 AREA | CEPHANELİK ALANININ YOLLARININ, TAMİRİ 2300 | 4.28.2018 | ASFALT KAPLAMA VE BETON KAPLAMA YOLLARIN ALT YAPISI VE ELEKTRIK BAGLANTILARI ILE YENILENMESI |
| 164 | 39th Air Base Wing (39 ABW) | PERFORM ENERGY AUDITS FOR INSTTALLATION COVERED BLDGS | US GENELI MUHTELIF BINALARDA ENERJI TEFTISI YAPILMASI | 7.07.2020 | ENERJI TEFTISI |
| 165 | 39th Air Base Wing (39 ABW) | REPAIR UPGRADE HVAC SYSTEM BILLETING FACILITY 1081 | BİNA 1081 HVAC SİSTEMİNİN TAMİRAT VE YENİLENMESİ | 6.12.2019 | HVAC SISTEM YENILENMESI |
| 166 | 39th Air Base Wing (39 ABW) | CONSTRUCT MODULAR BUILDING NEXT TO 6218‐CJSOTF | 6218 YANINA MODULER BINA INSAATI | 3.23.2018 | BINA INSAATI VE GEREKLI TUM MEKANIK,ELEKTRIK,MIMARI KALEMLERI ILE BIRLIKTE TAMAMLANMASI |
| 167 | 39th Air Base Wing (39 ABW) | UPGRADE/EXTEND FIRE STATION 2, B2105 | 2105 NOLU İTFAYE 2 BİNASININ TADİALATI | 2.28.2019 | ITFAIYE BINASI TUM GEREKLI MEKANIK,ELEKTRIK,CIVIL, MİMARI KALEMLERI ILE TAMAMLANMASI |
| 168 | 39th Air Base Wing (39 ABW) | DEMO OLD FINANCE FACILITY #480 AND OLD OPEN MESS FACILITY 884 | 480 NOLU ESKİ FİNANS BİNASININ VE 884 NOLU ESKİ YEMEKHANENİN YIKILMASI | 3.24.2020 | MEVCUT BINALARIN TEMELLERI ILE YIKILMASI VE YERINE YENI DOLGU YAPILMASI |
| 169 | 39th Air Base Wing (39 ABW) | INSTALL FIRE SPRINKLER SYSTEM PV MOTEL | PV MOTEL YANGIN ALARM SİSTEM MONTAJI | 8.29.2019 | YATAKHANELERDE YANGIN ALARM SISTEMI YENILENMESI |
| 170 | 39th Air Base Wing (39 ABW) | INSTALL FIRE ALARM&FIRE SPRINKLER SYSTEM, PV DORM | YATAKHANE BINALARINDA YANGIN ALARM & YANGIN YAGMURLAMA SISTEMI KURULUMU | 8.29.2019 | YATAKHANELERDE YANGIN ALARM SISTEMI YENILENMESI |
| 171 | 39th Air Base Wing (39 ABW) | EXPAND & REBUILD LIFT STATION BLDG 5023 & 5024 | 5023 VE 5024 NOLU BİNA ,TERFİ İSTASYONU GENİŞLETİRİLMESİ VE YENİLENMESİ | 10.23.2018 | TERFI ISTASYONU YENIDEN YAPILMASI |
| 172 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE LATERAL WATER LINES, PHANTOM HOUSING | PHANTOM EVLERİ BRANŞMAN SU HATLARI ONARIMI/YENİLENMESİ | 3.06.2019 | SU HATLARININ YENILENMESI |
| 173 | 39th Air Base Wing (39 ABW) | INSTALL CHLORINATION SYSTEM , GOLF COURSE | GOLF BOLGESINE KLORLAMA SISTEMININ KURULMASI | 11.30.2019 | KLORLAMA SISTEMI KURULMASI |
| 174 | 39th Air Base Wing (39 ABW) | REPAIR UPGRADE HV SUBSTATION, TR 83 BUILDING 1066 | TR83 YUKSEK GERILIM TRAFO MERKEZI TAMIRI BINA NO 1066 | 4.22.2019 | YUKSEK GERILIM KABLO YENILENMESI VE INSAATI |
| 175 | 39th Air Base Wing (39 ABW) | RPR/RPLC BATHTUBS AND SHOWERS, DORM 882 | 882 YATAKHANE BANYO TEKNELERİ VE DUŞLARININ ONARILMASI/YENİLENMESİ | 2.23.2021 | BANYO YENILENMESI |
| 176 | 39th Air Base Wing (39 ABW) | UPGRADE BACKBONE CABLING FOR ITBS 89.470 AND 1080 | 89, 470 ve 1070 NOLU BİNALARA YEDEK OMURGA KABLOLAMA YAPILMASI | 9.21.2019 | YEDEK OMURGA KABLOLAMA |
| 177 | 39th Air Base Wing (39 ABW) | RPR RPLC ROTOMAT MECHANICAL SCREEN LIFT STATION 5025 | POMPA ISTASYONU IZGARASI ONARIMI VE YENILENMESI , PISSU ISTASYONU NO:5025 | 8.29.2019 | POMPA ISTASYONU YENILENMESI |
| 178 | 39th Air Base Wing (39 ABW) | INSTALL REDUNDANT FO CABLING | YEDEK FİBER OPTİK KABLO DÖŞEME İŞİ | 6.15.2020 | FIBEROPTIK KABLO YENILENMESI |
| 179 | 39th Air Base Wing (39 ABW) | CONSTRUCTION OF PREFAB GYM PV DORMS | PREFABRİK SPOR SALONU TESİSİ İNŞA EDİLMESİ PATRIOT VILLAGE | 9.02.2020 | PREFABRIK SPOR SALONU INSAASI |
| 180 | 39th Air Base Wing (39 ABW) | CONSTRUCT CONCRETE ROAD FROM CLAMSHEEL TO HARDSTANDS 7&8 | HS7 VE HS8 DEN CADIRLARA BETON YOL INSAASI | 1.20.2021 | BETON YOL YAPILMASI ALT YAPI SISTEMI ILE |
| 181 | 39th Air Base Wing (39 ABW) | RPR UPGRADE OSI FAC BLDG 488 | 488 NOLU OSI BİNASI ONARIMI | 9.25.2020 | 488 NOLU BINA RENOVASYON |
| 182 | 39th Air Base Wing (39 ABW) | INSTALL ADITIONAL HOIST B7 B33 | 7 VE 33 NOLU BİNALARA EK VİNÇ YAPIMI | 5.03.2021 | VINC YAPILMASI |
| 183 | 39th Air Base Wing (39 ABW) | INSTALL POWER GENERATOR AP ATS, BUILDING 362 | JENERATÖR/OTOMATİK TRANSFER ŞALTERİ YERLEŞTİRİLMESİ, BİNA 362 | 9.11.2020 | JENERATOR DEGISIMI VE INSAAT |
| 184 | 39th Air Base Wing (39 ABW) | INSTALL FENCE AROUND GROUND CONTROL STATION, HS9 | YER KONTROL ETRAFINA TEL ÇİT YAPILMASI , HARDSTAND 9 | 6.23.2020 | CIT YENILENMESI |
| 185 | 39th Air Base Wing (39 ABW) | REPAIR RUNWAY STRIPING | PİST ÇİZGİLERİNİN YENİDEN BOYANMASI | 6.09.2021 | PIST CIZGILERI BOYANMASI |
| 186 | 39th Air Base Wing (39 ABW) | REPAIR BOWLING CENTER BUILDING 951 | 951 NOLU BİNA BOWLİNG BİNASI TADİLATI | 6.22.2021 | RENOVASYON |
| 187 | 39th Air Base Wing (39 ABW) | REPAIR AERATOR MOTORS | HAVALANDIRMA MOTORLARININ VERİMLİ TİP İLE DEGİŞİMİ & TAMİRATI, 207 NOLU BİNA | 7.28.2021 | HAVALANDIRMA SISTEMI YENILENMESI |
| 188 | 39th Air Base Wing (39 ABW) | REPAIR ACCESS ROAD TO BLDG 116 | 116 NOLU BINANIN GİRİŞ YOLUNUN TAMİRİ | 6.30.2021 | ASFALT YOL VE ALT YAPI YENILENMESI |
| 189 | 39th Air Base Wing (39 ABW) | REPAIR VARIOUS BASE ROADS | ÜS MUHTELİF YOLLARININ ONARIMI | 7.28.2021 | US GENELI DERZ DOLGU YENILENMESI |
| 190 | 39th Air Base Wing (39 ABW) | UPGRADE HV TRANSFORMER SUBSTATION BLDG 5387 (TR65) | TR65 YÜKSEK GERİLİM TRAFO MERKEZİ TAMİRİ BİNA NO 5387 | 7.26.2021 | YUKSEK GERILIM TRAFO MERKEZI INSAASI VE ELEKTRIK TESISATLARININ YAPILMASI |
| 191 | 39th Air Base Wing (39 ABW) | REPAIR RUNWAY EDGE LIGHT CABLE | PIST KENAR LAMBA KABLOLARININ TAMİRİ VE DEĞİŞİMİ | 7.29.2021 | KABLOLAMA VE INSAAT |
| 192 | 39th Air Base Wing (39 ABW) | REPAIR JOINT SEAL RUNWAY | PİST DERZLERİNİN YENİLENMESİ | 7.28.2021 | DERZ DOLGI YENILENMESI |
| 193 | 39th Air Base Wing (39 ABW) | INSTALL MV CABLE BETWEEN TR14, TR136 & SW1 | TR14, TR136 & SW1 BİNALARI ARASINDA OG KABLO MONTAJI | 7.29.2021 | ORTA GERILIM KABLO SISTEMI YENILENMESI |
| 194 | 39th Air Base Wing (39 ABW) | PROVIDE HV CABLE LOOP SYS , BLDG 5378 (TR‐50) | YG KABLO LOOP SİSTEMİNİ, BİNA NO 5378 (TR‐50) | 7.29.2021 | YUKSEK GERILIM KABLO SISTEMI YENILENMESI |
| 195 | 39th Air Base Wing (39 ABW) | UPDATE IAB SOURCE WATER / WELLHEAD PROTECTION PLAN | KAYNAK SUYU VE KUYU SUYU KORUMA PLANI | 8.26.2021 | DIZAYN |
| 196 | 39th Air Base Wing (39 ABW) | REPAIR UPGRADE HV CABLE BETWEEN BUILDING #400‐5301 | BİNA NO 400 İLE 5301 ARASINDAKİ YÜKSEK GERİLİM KABLOSUNUN TAMİRİ VE İYİLEŞTİRİLMESİ | 8.26.2021 | YUKSEK GERILIM KABLO YENILENMESI |
| 197 | 39th Air Base Wing (39 ABW) | MODELING SOFTWARE BASE WATER DISTRIBUTION SYS | SU DAGITIM SİSTEMİNİN YAZILIM MODELLEMESİ | 8.26.2021 | DIZAYN |
| 198 | 39th Air Base Wing (39 ABW) | INSTALL AWNING POST OFFICE BLDG 977 | 977 NOLU POSTA OFİSİ BİNASINA SUNDURMA MONTAJI | 8.31.2021 | SUNDURMA YAPILMASI |
| 199 | 39th Air Base Wing (39 ABW) | CONNECT BASE WATERLINE DISTRIBUTION SYSTEM TO ADANA CITYLINE | ANA SU İLETİM HATTININ ADANA ŞEHİR SU HATTINA BAĞLANMASI | ANA SU HATTI BAĞLANTISI | |
| 200 | 39th Air Base Wing (39 ABW) | REPAIR UPGRADE CABLE BETWEEN TR#10 (5367) & FAC. # 402 | KABLO TAMİRİ VE İYİLEŞTİRİLMESİ TRAFO 10 VE BİNA 402 ARASI | KABLO TAMİRİ | |
| 201 | 39th Air Base Wing (39 ABW) | LVIS&MAIN GATE SUNSHADE FOR PEDESTRIAN | YAYA YOLUNA GÜNEŞLİK YERLEŞTİRİLMESİ MÜTEAHHİT GİRİŞ KAPISI VE ANA NİZAMİYE | GİRİŞ KAPISINA GÜNEŞLİK YERLEŞTİRLMESİ | |
| 202 | 39th Air Base Wing (39 ABW) | REPAIR INSTALL DOCK LEVELER BUILDING # 412 | YÜKLEME RAMPASI TAMİRATI/YERLEŞTİRİLMESİ, BİNA 412 | YÜKLEME RAMPASI YAPIMI | |
| 203 | 39th Air Base Wing (39 ABW) | PROVIDE POWER TO TRAILER BY BUILDING 5209 | TREYLERE GÜÇ SAĞLAMAK, BİNA 5209 | TREYLERE GÜÇ SAĞLANMASI | |
| 204 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE WATER LINE B AVENUE (4 TH TO 5 TH STREETS) & B AVENUE TO E AVENUE | SU HATLARININ TAMİRATI/DEĞİŞİMİ (B CADDESİ (4.SOKAKTAN 5.SOKAĞA) B CADDESİNDEN E CADDESİNE | SU HATLARIN TAMİRATI | |
| 205 | 39th Air Base Wing (39 ABW) | RENOVATE BATHROOMS BUILDING # 526 | TUVALETLERİN TAMİRATI | TUVALETLERİN TAMİRATI | |
| 206 | 39th Air Base Wing (39 ABW) | CONSTRUCTION ROADS TRANSFORMER SUBSTATIONS | YOL TAMİRATI, ELEKTRİK TRAFO MERKEZİ MUHTELİF BİNALAR | TRAFO BİNASI YOL TAMİRATI | |
| 207 | 39th Air Base Wing (39 ABW) | CONSTRUCT NEW HOUSING FURNITURE WAREHOUSE | MOBİLYA DEPOSU İNŞAATI | DEPO İNŞAATI YAPIMI | |
| 208 | 39th Air Base Wing (39 ABW) | REPAIR PAVEMENT AIRFIELD | BANKETLERİN TAMİRİ | BENKETLERİN TAMİR YAPIMI | |
| 209 | 39th Air Base Wing (39 ABW) | CONSTRUCTION BYPASS WATER LINE BETWEEN MUNITIONS & A STREET PUMP HOUSE | BYPASS SU HATTI İNŞAATI | BYPASS SU HATTI İNŞAATI | |
| 210 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE GENERATOR/SWITCHGEAR, MULTI FACILITIES | JENERETOR VE SWITCHGEAR TAMIRI | ÇOKLU TESİS DEĞİŞİMİ | |
| 211 | 39th Air Base Wing (39 ABW) | AGE EQUIPMENT PADS, VARIOUS LOCATIONS | ÇEŞİTLİ LOKASYONLARDA AGE EKİPMAN SAHASI YAPIMI | AGE EKİPMAN SAHASI YAPIMI | |
| 212 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE FUEL TANK, BUILDING # 35 | YAKIT TANKLARININ TAMİRİ/DEĞİŞİMİ BİNA 35 | YAKIT TANKLARIN TAMIRI | |
| 213 | 39th Air Base Wing (39 ABW) | REPAIR/REPLACE CABLES BETWEEN TRANSFORMERS&FEEDERS 5031 | TRAFO MERKEZLERİ ARASINDAKİ BESLEME KABLOLARININ TAMİRATI/DEĞİŞİMİ BİNA 3610-TR61-84-69-68-124-112-137 | TRAFO BINALAR ARASINDAKI KABLOLARIN TAMIRATI | |
| 214 | 39th Air Base Wing (39 ABW) | Repair/Replace Water Line with HDPE, Multiple Locations | ÇOKLU LOKASYONLARDA SU HATLARININ HDPE BORU İLE TAMİR VE YENİLENMESİ | HDPE BORU TAMIRI VE YENILENEMSI | |
| 215 | 39th Air Base Wing (39 ABW) | REPAIR AIRCRAFT HANGAR 4, BLDG 345 | 345 NOLU UÇAK HANGAR BİNASININ ONARIMI | HANGAR BİNASI ONARIMI | |
| 216 | 39th Air Base Wing (39 ABW) | RPR-RPL Water Line with HDPE btwn 2nd St and B Ave | 2. SOKAK VE B CADDESİ ARASINDAKİ HDPE SU HATTININ TAMİRİ VE YENİLENMESİ | HDPE SU HATTI TAMİRİ | |
| 217 | 39th Air Base Wing (39 ABW) | MAINTAIN OIL WATER SEPARATOR, BASE WIDE | US BÖLGESİNDEKİ YAĞ AYIRICILARIN BAKIMI | YAĞ AYIRICILARIN BAKIMI | |
| 218 | 39th Air Base Wing (39 ABW) | Paint Various Facilities 244, 350 AND 1080 | ÇEŞİTLİ BİNALARIN BOYANMASI | ÇEŞİTLİ BİNALARIN BOYANMASI | |